CLSF18-12 Fully Insulated Sealed Common-Enclosure Gas-Insulated Ring Main Unit
Compact modular switchgear. The sealed design provides high safety, long service life, and stable operation in harsh environments. IP67 protection. Maintenance-free design.
12Kv
Rated Voltage
Max 4000A
Rated Current
Max 50KA
Rated Short-circuit Current
IEC62271-200
IEC 60529
Industrial Standard
Configuration
OEM Customizable
FAT Test
Delivery Standard
Key Technical Data for Project Configuration
The following table is only a framework for critical performance data for fast project evaluation. The standard configuration range is not a universal promise.Technical Data Overview
| Parameter | Unit | Value | ||
|---|---|---|---|---|
| Rated Voltage | KV | 12 | ||
| Rated Frequency | Hz | 50 | ||
| Rated Insulation Level | 1 min Power Frequency Withstand Voltage Rated | Phase-to-Phase Gap | KV | 42 |
| Phase-to-Earth Gap | KV | 48 | ||
| Lightning Impulse Withstand Voltage (Peak) | Phase-to-Phase Gap | KV | 75 | |
| Phase-to-Earth Gap | KV | 85 | ||
| Main Busbar Rated Current | A | 630 | ||
| Branch Bar Rated Current | A | 630 | ||
| Rated Short-time Withstand Current (4s) | KA | 20 | ||
| Rated Withstand Current (Peak Value) | KA | 50 | ||
| Annual Gas Leakage Rate | % | ≤ 0.25 | ||
| Rated Operating Gas Pressure / Minimum Gas Pressure (+20 °C) | MPa | 0.04 ~ 0.02 | ||
| Mechanical Life | Load Break Switch | M1 Class (1,000 ops) / M2 Class (5,000 ops) | ||
| Earthing Switch | M0 Class (1,000 ops) / M1 Class (2,000 ops) | |||
| Protection (IP) Rating | SF₆ Gas Compartment | IP67 | ||
| Fuse Barrel | ||||
| Switchgear Enclosure | IP3X | |||
Configured to Your Project Requirements
Electrical
Mechanical
Components
Documentation
Tips: Final configuration is confirmed according to approved drawings, project requirements, and destination market needs
Switchgear Projects & Applications
Representative projects of CLSF18-12 Fully Insulated Sealed Common-Enclosure Gas-Insulated Ring Main Unit.

Power distribution solutions for small secondary substations and switching stations in constrained places.
6-35Kv
Voltage
~4000A
Current
China
Country
Substations
Application

Critical power supply and distribution for the transportation network.
6-35Kv
Voltage
~4000A
Current
China
Country
Railways
Application

Maintenance-free power distribution solutions for high-rise buildings and commercial complexes.
0.4-25Kv
Voltage
~2500A
Current
China
Country
Buildings
Application
Quality Control You Can See Before Shipment
Every switchgear cabinet that leaves our facility must pass through a five-stage quality assurance process, from raw materials to final release for shipment.
Verified Components Before They Enter Your Switchgear
All purchased components, such as circuit breakers, transformers, insulators, busbar material, and auxiliary devices, are verified against approved vendor lists and inspected upon receipt.Verifying Certificates & Test Data
Verify the certificates of conformity, type test reports, and factory test data.
Inspecting Structural Parts
Conduct dimensional and visual inspection of busbars, enclosures, and structural parts.
Testing Insulating Materials
Run sampling tests on insulating materials and other components.
Rejecting Non-Conforming Parts
Prevent defective components from entering the production line to safeguard the original reliability.

Precision Assembly That Meets the Drawing
Component assembly must strictly follow standard operating procedures to ensure worker safety while maintaining a clean, dust-free workshop environment.Torquing Every Bolted Connection
Tighten all bolted joints to specified torque values, with each connection point recorded for traceability.
Verifying Clearances & Phase Sequence
Check conductor clearances, creepage distances, and phase sequence against design drawings.
Testing Shutters, Interlocks & Truck Mechanisms
Verify shutters, interlocks, and the truck’s mechanical performance in different positions: service, test, and withdrawn.
Checking Wiring Against Schematics
Check all internal wiring against schematics, including ferrule identification, terminal tightening, and earthing continuity.

Every Panel Proves Safe in Electrical Verification
Before any energization, each panel undergoes a comprehensive program of routine tests in accordance with IEC 60298 and GB 3906.Measuring Main Circuit Resistance
Measure the resistance of the main circuit.
Applying Withstand Voltage Tests
Run a power-frequency withstand voltage test on the main circuit and auxiliary circuits.
Measuring Partial Discharge
Verify misoperation-prevention functions; detect partial discharge where specified.
Testing Relays & Verifying Metering
Test protection relays by secondary injection and verify metering accuracy.

Nothing Ships Only With Approval
The FAT confirms that the switchgear is built in conformity with the approved drawings, the technical specification, and all applicable standards.Repeating Comprehensive Checks
Perform visual and mechanical checks; verify design drawings, test procedures, and technical documents.
Running Key Tests Per Standards
Conduct tests per IEC standards and project specs, including withstand tests, primary/secondary injection tests, and corrosion resistance tests.
Re-Testing Before Release
Record deviations or non-conformities during FAT, take corrective measures, and re-test until all units pass before release.
Preparing Before Shipping
Issue the FAT report and release certificate; clean the cabinet surface.

From Our Factory Floor to Your Site, Intact and On Time
Shipment isn’t simply switchgear dispatched. Every step follows a controlled process covering final verification, export-grade protection, document preparation, and coordinated logistics.Packing for Export
Pack each cabinet in export-grade packaging with moisture proofing and shock absorbers.
Coordinating the Logistics
Manage the entire transport chain —booking, routing, and customs coordination—to ensure on-time delivery to the site.
Documenting Before Dispatch
Photograph and record packaging, loading, and container sealing.
Delivering the Full Dossier
Prepare a complete documentation package for every shipment: routine test reports, FAT protocol, operating manuals, and spare parts list.
Global Electrical Industry Partners & Customers
Provide customers with production line technical consultation, engineering design, design selection, engineering budgeting, factory automation, full-process training, installation, commissioning, and turnkey solutions for the entire factory.

Engineer Online
+86 123 456 7890






Standards & Certifications
Use this space to add a medium-length description. Be brief and give enough information to earn their attention.
Sample documents available upon request.
Built for Fast, Safe Grid & Plant Integration
Use this space to give website visitors a brief description of what to expect before clicking a section title.
Info@businessname.com
WhatsApp/WeChat
+86 123 456 78900
Business Hours
9:00 AM – 6:00 PM GMT+08:00
Location
Henan Province, China













