KYN28A-12 Metal-Clad Withdrawable Switchgear
From 3.6kV to 12kV, 630–5000A. Core components from world-renowned brands Schneider, ABB, and GE. Reliable choice for commercial establishments, industrial plants, and substations. Factory-tested, project-configured, and delivered with full technical documentation.
12kV
Rated Voltage
Max 5000A
Rated Current
Max 50kA
Short-circuit Current
IEC62271-200
Industrial Standard
Configuration
OEM/ Customizable
FAT Test
Delivery Standard
Key Technical Data for Project Configuration
The following table only provides a framework for critical performance data for quick project evaluation. The standard configuration range is not a universal promise.Technical Data Overview
K | Y | N | 28A | 12 |
|---|---|---|---|---|
Metal-Clad | Withdrawable | Indoor | Design sequence number | Rated voltage (KV) |
| Parameter | Unit | Value | ||
|---|---|---|---|---|
| Rated Voltage | KV | 3.6, 7.2, 12 | ||
| Rated Frequency | Hz | 50 | ||
| Rated Insulation Level | 1 min Power Frequency Withstand Voltage Rated | Phase-to-Phase, Phase-to-Earth | KV | 24, 32, 42 |
| Isolation Gap | KV | 24, 32, 48 | ||
| Lightning Impulse Withstand Voltage (Peak) | Phase-to-Phase, Phase-to-Earth | KV | 40, 60, 75 | |
| Isolation Gap | KV | 46, 70, 85 | ||
| Main Busbar Rated Current | A | 630, 1250, 1600, 2000, 2500, 3150, 4000, 5000 | ||
| Branch Bar Rated Current | A | 630, 1250, 1600, 2000, 2500, 3150, 4000, 5000 | ||
| Rated Short-time Withstand Current (4s) | KA | 16, 20, 25, 31.5, 40, 50 | ||
| Rated Withstand Current (Peak Value) | KA | 40, 50, 63, 80, 100, 125 | ||
| Rated Short-Circuit Breaking Current | KA | 16, 20, 25, 31.5, 40, 50 | ||
| Rated Short-Circuit Closing Current (Peak Value) | KA | 40, 50, 63, 80, 100, 125 | ||
| Protection (IP)Rating | Enclosure | IP4X | ||
| Compartment and circuit breaker doors are open | IP2X | |||
Configured to Your Project Requirements
Electrical
Mechanical
Components
Documentation
Tips: Final configuration is confirmed according to approved drawings, project requirements, and destination market needs.
Switchgear Projects & Applications
Representative Projects of KYN28a-2 Metal-Clad Withdrawable Switchgear.

Airport
The Phase II expansion of Tianjin Binhai International Airport — designed for 25 million passengers and 1.7 million tonnes of cargo annually — adopted KYN28A-12 switchgear to ensure reliable power supply across its new T2 terminal and supporting facilities.
3.6-12Kv
Voltage
~4000A
Current
China
Country
Airport
Application

Commercial Complex
The Huaqiang Golden Corridor City Plaza in Shenyang is a 1.2 million m² industrial complex that integrates premium offices and e-commerce headquarters, and it selected KYN28A-12 switchgear as the core of its distribution network.
3.6-12Kv
Voltage
~4000A
Current
China
Country
Buildings
Application

Gymnasium
The China-aided Yaoundé Multipurpose Gymnasium complex project in Cameroon is a 5,000-seat, 12,000 m² multi-sport venue built to international competition standards, fully equipped with KYN28A-12 switchgear for its high-voltage power distribution system.
3.6-12Kv
Voltage
~2500A
Current
Cameroon
Country
Gym
Application
Quality Control You Can See Before Shipment
Every switchgear cabinet leaving our facility must pass a five-stage quality assurance process, from raw materials to final shipment release.
Verified Components Before They Enter Your Switchgear
We verify all purchased components, such as circuit breakers, transformers, insulators, busbar material, and auxiliary devices, against approved vendor lists and inspect them upon receipt.Certificates & Test Data
Verify the certificates of conformity, type test reports, and factory test data.
Inspecting Structural Parts
Conduct dimensional and visual inspection of busbars, enclosures, and structural parts.
Testing Insulating Materials
Run sampling tests on insulating materials and other components.
Reject Defective Parts
Prevent defective components from entering the production line to safeguard the original reliability.

Precision Assembly That Meets the Drawing
Component assembly must strictly follow standard operating procedures to ensure worker safety while maintaining a clean, dust-free workshop environment.Torquing Every Bolted Connection
Tighten all bolted joints to the specified torque values and record each connection point for traceability.
Verifying Clearances & Phase Sequence
Check conductor clearances, creepage distances, and phase sequence against design drawings.
Testing Shutters, Interlocks & Truck Mechanisms
Verify shutters, interlocks, and the truck’s mechanical performance in different positions: service, test, and withdrawn.
Checking Wiring Against Schematics
Check all internal wiring against schematics, including ferrule identification, terminal tightening, and earthing continuity.

Every Panel Proves Safe in Electrical Verification
Before any energization, each panel undergoes a comprehensive program of routine tests in accordance with IEC 60298 and GB 3906.Measuring Main Circuit Resistance
Measure the main circuit resistance.
Applying Withstand Voltage Tests
Run a power-frequency withstand voltage test on the main circuit and auxiliary circuits.
Measuring Partial Discharge
Verify misoperation-prevention functions; detect partial discharge where specified.
Relays & Metering Testing
Test protection relays by secondary injection and verify metering accuracy.

Nothing Ships Only With Approval
The FAT confirms that the switchgear is built in conformity with the approved drawings, the technical specification, and all applicable standards.Repeating Comprehensive Checks
Perform visual and mechanical checks; verify design drawings, test procedures, and technical documents.
Running Key Tests Per Standards
Conduct tests per IEC standards and project specs, including 1st/2nd injection tests and corrosion-resistance tests, etc.
Re-Testing Before Release
Record deviations or non-conformities during FAT, take corrective measures, and re-test until all units pass before release.
Preparing Before Shipping
Issue the FAT report and release certificate; clean the cabinet surface.

From Our Factory Floor to Your Site, Intact and On Time
Shipment isn’t simply switchgear dispatched. Every step follows a controlled process covering final verification, export-grade protection, document preparation, and coordinated logistics.Packing for Export
Pack each cabinet in export-grade packaging with moisture proofing and shock absorbers.
Coordinating the Logistics
Manage the entire transport chain —booking, routing, and customs coordination—to ensure on-time delivery to the site.
Documentation Preparing
Photograph and record packaging, loading, and container sealing.
Delivering the Full Dossier
Complete the documentation package for every shipment, including the spare parts list.
Global Electrical Industry Partners & Customers
Provide customers with production line technical consultation, engineering design, design selection, engineering budgeting, factory automation, full-process training, installation, commissioning, and turnkey solutions for the entire factory.

Engineer Online
+86 123 456 7890






Standards & Certifications
Use this space to add a medium-length description. Be brief and give enough information to earn their attention.
Sample documents available upon request.
From Project Requirements to Delivered Electrical Equipment
Confirm final electrical ratings and configurations against the project specification and approved engineering documents.
Built for Fast, Safe Grid & Plant Integration
Find answers to common questions, or share your project details with our technical team for tailored support.
Info@businessname.com
WhatsApp/WeChat
+86 123 456 78900
Business Hours
9:00 AM – 6:00 PM GMT+08:00
Location
Henan Province, China














