GGD Low-Voltage Fixed Switchgear
GGD-type AC low-voltage distribution cabinets suit 50 Hz power distribution systems with a rated operating voltage of 380 V and a rated current of up to 3,150 A. They are used in power plants, substations, industrial and mining enterprises, and other power-consuming facilities to convert, distribute, and control electrical energy for power, lighting, and distribution equipment.
380V
Rated Voltage
Max 3150A
Rated Current
Max 50KA
Short-circuit Current
IEC 61439-1/-2
Industrial Standard
Configuration
OEM/ Customizable
FAT Test
Delivery Standard
Key Technical Data for Project Configuration
The following table is only a framework for critical performance data for fast project evaluation. The standard configuration range is not a universal promise.Technical Data Overview
| Model | Rated Voltage(V) | Rated Current(A) | Rated Short-Circuit Breaking Current(kA) | Rated Short-Time Withstand Current(kA) | Rated Peak Withstand Current(kA) | |
| GGD1 | 380 | A | 1000 | 15 | 15 | 30 |
| B | 600(630) | |||||
| C | 400 | |||||
| GGD2 | 380 | A | 1500(1600) | 30 | 30 | 63 |
| B | 1000 | |||||
| C | / | |||||
| GGD3 | 380 | A | 3150 | 50 | 50 | 105 |
| B | 2500 | |||||
| B | 2000 | |||||
Configured to Your Project Requirements
Electrical
Mechanical
Components
Documentation
Tips: Final configuration is confirmed according to approved drawings, project requirements, and destination market needs.
Switchgear Projects & Applications
Representative project environments and typical configuration needs for low-voltage and medium-voltage distribution systems.

Switchgear Solution for a 100,000T/y Activated Carbon Project
The 100,000 t/y Coal-Based Activated Carbon Project is a key industrial project in Shanxi Province. We supplied high- and low-voltage switchgear and power distribution equipment to provide reliable power distribution, control, and protection for the project’s production lines and auxiliary facilities.
0.38-12Kv
Voltage
~3150A
Current
China
Country
Factory
Application

Switchgear Solution for a 2.6 Million t/y Coke Project
The 2.6 million t/y Coke Project (Phase I) is a large-scale coke production project in Henan Province. We supplied GGD-type low-voltage switchgear, soft starters, VFD cabinets, and PLC cabinets, including installation, to meet the project’s power distribution, motor control, and automation needs.
0.38-12Kv
Voltage
~3150A
Current
China
Country
Coal Plant
Application

Switchgear Solution for a Large-Scale Commercial Complex
The project has a total investment of approximately RMB 15 billion and integrates e-commerce, corporate offices, and cultural and creative facilities. We supplied high- and low-voltage switchgear and power distribution equipment for the project’s buildings and supporting facilities.
0.38-25Kv
Voltage
~2500A
Current
China
Country
Buildings
Application
Quality Control You Can See Before Shipment
Every switchgear cabinet leaving our facility must pass a five-stage quality assurance process, from raw materials to final shipment release.
Verified Components Before They Enter Your Switchgear
We verify all purchased components, such as circuit breakers, transformers, insulators, busbar material, and auxiliary devices, against approved vendor lists and inspect them upon receipt.Certificates & Test Data
Verify the certificates of conformity, type test reports, and factory test data.
Inspecting Structural Parts
Conduct dimensional and visual inspection of busbars, enclosures, and structural parts.
Testing Insulating Materials
Run sampling tests on insulating materials and other components.
Reject Defective Parts
Prevent defective components from entering the production line to safeguard the original reliability.

Precision Assembly That Meets the Drawing
Component assembly must strictly follow standard operating procedures to ensure worker safety while maintaining a clean, dust-free workshop environment.Torquing Every Bolted Connection
Tighten all bolted joints to the specified torque values and record each connection point for traceability.
Verifying Clearances & Phase Sequence
Check conductor clearances, creepage distances, and phase sequence against design drawings.
Testing Shutters, Interlocks & Truck Mechanisms
Verify shutters, interlocks, and the truck’s mechanical performance in different positions: service, test, and withdrawn.
Checking Wiring Against Schematics
Check all internal wiring against schematics, including ferrule identification, terminal tightening, and earthing continuity.

Every Panel Proves Safe in Electrical Verification
Before any energization, each panel undergoes a comprehensive program of routine tests in accordance with IEC 60298 and GB 3906.Measuring Main Circuit Resistance
Measure the main circuit resistance.
Applying Withstand Voltage Tests
Run a power-frequency withstand voltage test on the main circuit and auxiliary circuits.
Measuring Partial Discharge
Verify misoperation-prevention functions; detect partial discharge where specified.
Relays & Metering Testing
Test protection relays by secondary injection and verify metering accuracy.

Nothing Ships Only With Approval
The FAT confirms that the switchgear is built in conformity with the approved drawings, the technical specification, and all applicable standards.Repeating Comprehensive Checks
Perform visual and mechanical checks; verify design drawings, test procedures, and technical documents.
Running Key Tests Per Standards
Conduct tests per IEC standards and project specs, including 1st/2nd injection tests and corrosion-resistance tests, etc.
Re-Testing Before Release
Record deviations or non-conformities during FAT, take corrective measures, and re-test until all units pass before release.
Preparing Before Shipping
Issue the FAT report and release certificate; clean the cabinet surface.

From Our Factory Floor to Your Site, Intact and On Time
Shipment isn’t simply switchgear dispatched. Every step follows a controlled process covering final verification, export-grade protection, document preparation, and coordinated logistics.Packing for Export
Pack each cabinet in export-grade packaging with moisture proofing and shock absorbers.
Coordinating the Logistics
Manage the entire transport chain —booking, routing, and customs coordination—to ensure on-time delivery to the site.
Documentation Preparing
Photograph and record packaging, loading, and container sealing.
Delivering the Full Dossier
Complete the documentation package for every shipment, including the spare parts list.
Global Electrical Industry Partners & Customers
Provide customers with production line technical consultation, engineering design, design selection, engineering budgeting, factory automation, full-process training, installation, commissioning, and turnkey solutions for the entire factory.

Engineer Online
+86 123 456 7890






Standards & Certifications
Use this space to add a medium-length description. Be brief and give enough information to earn their attention.
Sample documents available upon request.
From Project Requirements to Delivered Electrical Equipment
Confirm final electrical ratings and configurations against the project specification and approved engineering documents.
Built for Fast, Safe Grid & Plant Integration
The following answers address common questions about GGD low-voltage fixed switchgear. For project-specific requirements, our engineering team is available to help.
Info@businessname.com
WhatsApp/WeChat
+86 123 456 78900
Business Hours
9:00 AM – 6:00 PM GMT+08:00
Location
Henan Province, China














