HXGN-12 Box-Type Fixed Metal-Enclosed Ring Main Unit
Lightweight and compact design with flexible expansion capability. Five-prevention safety interlock system. Maintenance-free Operation for 20 Years. IEC 62271-200 Standards Compliance.
12kV
Rated Voltage
Max 630A
Rated Current
Max 50kA
Short-circuit Current
IEC62271-200
Industrial Standard
Configuration
OEM/Customizable
FAT Test
Delivery Standard
Key Technical Data for Project Configuration
The following table is only a framework for critical performance data for fast project evaluation. The standard configuration range is not a universal promise.Technical Data Overview
H | X | G | N | 12 |
|---|---|---|---|---|
Ring Main Unit | Box-type | Fixed | Indoor | Rated Voltage |
| Parameter | Unit | Value | ||
|---|---|---|---|---|
| Rated Voltage | kV | 12 | ||
| Rated Frequency | Hz | 50 | ||
| Rated Insulation Level | 1 min Power Frequency Withstand Voltage Rated | Phase-to-Phase Gap, Phase-to-Earth Gap | kV | 42 |
| Isolation Gap | kV | 48 | ||
| Lightning Impulse Withstand Voltage (Peak) | Phase-to-Phase Gap, Phase-to-Earth Gap | kV | 75 | |
| Isolation Gap | kV | 85 | ||
| Main Busbar Rated Current | A | 630 | ||
| Branch Bar Rated Current | A | 630 | ||
| Rated Short-time Withstand Current (4s) | kA | 20 | ||
| Rated Withstand Current (Peak Value) | kA | 50 | ||
| Rated Short-Circuit Breaking Current | kA | 31.5 | ||
| Protection (IP)Rating | Shell IP rating based on the actual installation environment. For dusty or humid environments, we can optimise enclosure protection, ventilation, and anti-condensation design accordingly. | IP3X (Minimum Customisation Requirement) | ||
Configured to Your Project Requirements
Electrical
Mechanical
Components
Documentation
Tips: Final configuration is confirmed according to approved drawings, project requirements, and destination market needs.
Switchgear Projects & Applications
Representative Projects of HXGN-12 Box-Type Fixed Metal-Enclosed Ring Main Unit.

Urban Power Grid
HXGN-12 ring main units provide reliable power distribution and intelligent monitoring for urban infrastructure networks and distribution substations. Their fixed, compact design requires minimal installation space. With comprehensive protection functions and stable performance, they ensure safe and continuous power supply to city residents and public facilities.
6-12Kv
Voltage
~4000A
Current
China
Country
Utility
Application

Heavy Industrial Factory
For heavy industry enterprises, HXGN-12 ring main units deliver reliable power supply and protection for heavy-duty operations. The robust metal-enclosed structure withstands dust, vibration, and corrosive environments typical of industrial sites. Its simple fixed design ensures easy operation and low maintenance.
6-12Kv
Voltage
~4000A
Current
China
Country
Factory
Application

Hospital
In commercial complexes like hospitals, HXGN-12 ring main units offer space-constrained power distribution solutions with reliable performance. The metal-clad enclosure provides excellent protection against accidental contact and ensures safe operation in densely occupied public areas.
6-12Kv
Voltage
~2500A
Current
China
Country
Hospital
Application
Quality Control You Can See Before Shipment
Every switchgear cabinet leaving our facility must pass a five-stage quality assurance process, from raw materials to final shipment release.
Verified Components Before They Enter Your Switchgear
We verify all purchased components, such as circuit breakers, transformers, insulators, busbar material, and auxiliary devices, against approved vendor lists and inspect them upon receipt.Certificates & Test Data
Verify the certificates of conformity, type test reports, and factory test data.
Inspecting Structural Parts
Conduct dimensional and visual inspection of busbars, enclosures, and structural parts.
Testing Insulating Materials
Run sampling tests on insulating materials and other components.
Reject Defective Parts
Prevent defective components from entering the production line to safeguard the original reliability.

Precision Assembly That Meets the Drawing
Component assembly must strictly follow standard operating procedures to ensure worker safety while maintaining a clean, dust-free workshop environment.Torquing Every Bolted Connection
Tighten all bolted joints to the specified torque values and record each connection point for traceability.
Verifying Clearances & Phase Sequence
Check conductor clearances, creepage distances, and phase sequence against design drawings.
Testing Shutters, Interlocks & Truck Mechanisms
Verify shutters, interlocks, and the truck’s mechanical performance in different positions: service, test, and withdrawn.
Checking Wiring Against Schematics
Check all internal wiring against schematics, including ferrule identification, terminal tightening, and earthing continuity.

Every Panel Proves Safe in Electrical Verification
Before any energization, each panel undergoes a comprehensive program of routine tests in accordance with IEC 60298 and GB 3906.Measuring Main Circuit Resistance
Measure the main circuit resistance.
Applying Withstand Voltage Tests
Run a power-frequency withstand voltage test on the main circuit and auxiliary circuits.
Measuring Partial Discharge
Verify misoperation-prevention functions; detect partial discharge where specified.
Relays & Metering Testing
Test protection relays by secondary injection and verify metering accuracy.

Nothing Ships Only With Approval
The FAT confirms that the switchgear is built in conformity with the approved drawings, the technical specification, and all applicable standards.Repeating Comprehensive Checks
Perform visual and mechanical checks; verify design drawings, test procedures, and technical documents.
Running Key Tests Per Standards
Conduct tests per IEC standards and project specs, including 1st/2nd injection tests and corrosion-resistance tests, etc.
Re-Testing Before Release
Record deviations or non-conformities during FAT, take corrective measures, and re-test until all units pass before release.
Preparing Before Shipping
Issue the FAT report and release certificate; clean the cabinet surface.

From Our Factory Floor to Your Site, Intact and On Time
Shipment isn’t simply switchgear dispatched. Every step follows a controlled process covering final verification, export-grade protection, document preparation, and coordinated logistics.Packing for Export
Pack each cabinet in export-grade packaging with moisture proofing and shock absorbers.
Coordinating the Logistics
Manage the entire transport chain —booking, routing, and customs coordination—to ensure on-time delivery to the site.
Documentation Preparing
Photograph and record packaging, loading, and container sealing.
Delivering the Full Dossier
Complete the documentation package for every shipment, including the spare parts list.
Global Electrical Industry Partners & Customers
Provide customers with production line technical consultation, engineering design, design selection, engineering budgeting, factory automation, full-process training, installation, commissioning, and turnkey solutions for the entire factory.

Engineer Online
+86 123 456 7890






Standards & Certifications
Use this space to add a medium-length description. Be brief and give enough information to earn their attention.
Sample documents available upon request.
From Project Requirements to Delivered Electrical Equipment
Confirm final electrical ratings and configurations against the project specification and approved engineering documents.
Built for Fast, Safe Grid & Plant Integration
Find answers to common questions, or share your project details with our technical team for tailored support.
Info@businessname.com
WhatsApp/WeChat
+86 123 456 78900
Business Hours
9:00 AM – 6:00 PM GMT+08:00
Location
Henan Province, China















