Project Background

A mining group operating an open-pit coal mine and an associated mineral processing plant in a mountainous region needed a complete medium-voltage power distribution solution. The site includes crushing stations, grinding and flotation workshops, and slurry pump stations — all of which depend on stable power to keep ore processing running around the clock.

Challenges

  • Remote location with unstable grid supply and frequent voltage fluctuations.
  • Extreme operating conditions: high humidity, large temperature swings between day and night, dust-laden air, and exposure to corrosive mine gases.
  • Multiple large motor loads (crushers, mills, pumps) causing switching surges and demanding high short-circuit withstand capability.
  • Difficulty of on-site maintenance — skilled technicians and spare parts are days away.

Solution

The XGN35-12 Box-Type Fixed Metal-Enclosed Switchgear was deployed as the main incoming and outgoing distribution equipment for the mine’s 10 kV system, feeding the processing plant and auxiliary facilities. Key configuration highlights:

  • Robust fully welded metal enclosure with high IP protection rating, resistant to dust, moisture, and corrosive atmospheres.
  • High short-circuit breaking and withstand capacity to handle heavy motor starting and grid fluctuation conditions.
  • Fixed breaker design with minimal moving parts to reduce mechanical failure points in a hard-to-service location.
  • Fully interlocked, padlockable operation ensuring safety in a multi-shift, multi-operator environment.
  • Complete factory assembly and testing, enabling fast on-site installation and commissioning in the remote area.

Results

  • Stable and uninterrupted power supply for crushing, grinding, and flotation operations, supporting the mine’s 7×24 production schedule.
  • Substantially reduced maintenance workload and spare-part consumption due to the simple, robust fixed-type construction.
  • Enhanced operational safety: the interlock system and compartmentalized design have eliminated electrical accidents since commissioning.
  • Fast project delivery: equipment was energized on schedule, avoiding costly delays to mine production ramp-up.